Environmental and Social Impact Study for the 220 kV transmission line that will connect the city of Lubango (Huíla) and the city of Moçâmedes (Namibe) within the scope of the Energy Angola 2025 Strategy. The project also includes the construction of a substation in Namibe. The scope of Holísticos' work also includes the elaboration of the Stakeholder Engagement Plan and its implementation. The studies will be guided by national legislation as well as by the environmental and social guidelines of JICA (Japanese International Cooperation Agency).